Installation of WPC wall panel

2024/07/29

1、Implementation starts with signing montage areas on the wall. First of all, framework, which will be on bottom, montage is done. The signed parts are opened by drill and then screwing is done. After measuring the gap between the second framework and the first one, second framework is screwed. The gap between frameworks must be 50-60 cm, but not more than 60 cm.

2、With water gauge, assembly starts with first wall panel. Wall panels are joined together with montage clips. Clips are screwed.

3、Another wall panel is joined to screwed clips. Wall panels are fixed heavily by using protection batten. Other is fixed as same method.

4、At starting point, wall panels measured by water gauge and process keeps like the previous steps.

5、Finally ending points of wall panels are covered with the corner

(accessories).