News

Installation steps of PVC marble sheet

2024/07/29

Step 1. Measure the wall

Measure the wall with tape ruler to work out the installation area and how many pieces of panels are demanded.

Step 2. Clean the wall

Please make the wall clean, there must not be dust and water on it.

The double adhesive tape would bond the panel and wall initially. If there were dust and water, the adhesive would

just bond the dust on wall, but not the wall, consequently the tape can not hold the panel on wall. ​

Step 3. Cut the panel

The panel in original size could be installed on wall directly, so the installation is very quick. If the panel would have

to be installed in small size, then just cut panel into wanted small size with cutter. Cutter can go 2 or 3 times along a

direct line to make a shallow groove, the panel can be folded into two small pieces along this groove easily.

Step 4. Put double adhesive tape and glue on panel

Put a few of double adhesive tapes on panel, just a few of tapes is enough to hold the panel with good bonding force,

then put some glue on panel with glue pusher on scattered area of panel back.

The double adhesive tape would bond the panel on wall temporarily before the bonding force of glue works. The

bonding force of glue would work in next 4 to 24 hours after panel is installed on wall.

Step 5. Put the panel on wall

Just gently put the panel on the wanted area of wall. It should be installed carefully to meet the clips perfectly.